Laserfiche WebLink
Parkdale Quarry Expansion Project <br /> <br />Attachment 16.0 – Utility Plan <br /> <br />The only permanent utilities on the site are the Black Hill Electric lines that run overhead on poles along <br />the southern side of the Martin Marietta-owned portion of the site, and a fiber-optic communication <br />line that enters the site at County Road 115, and is attached to Black Hills Energy power poles. All other <br />utilities are temporary for the life of the operation, and will be removed during final reclamation of the <br />site. Water for sanitation uses is provided from a storage tank that is filled from off site. Septic waste on <br />the site is collected in porta-potties or in holding tanks that are pumped out on a regular basis so that <br />septic waste can be disposed of off site. There is no natural gas on the site. There are no plans at this <br />time to add additional permanent utilities on the site. The location of the Black Hills power poles is <br />shown on the Pre-Mining Site Plan maps in Attachment 17. <br /> <br /> <br /> <br />