My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-04-27_PERMIT FILE - C1996083 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083
>
2021-04-27_PERMIT FILE - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 8:10:32 AM
Creation date
5/10/2021 8:08:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Permit File
Doc Date
4/27/2021
Doc Name
TOC and Introduction
Type & Sequence
MR203
Section_Exhibit Name
Volume IX Coal Mine Waste Disposal Area No. 2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Introduction <br />The Bowie No. 2 Mine was constructed and opened by Bowie Resources, LLC <br />during the spring and summer of 1997 with coal production and development <br />beginning on August 15, 1997. The mine began longwall production during <br />November 1999 and currently produces coal at the rate of about 2.5 million tons <br />per year. <br />Over the course of mining operations for the last 14+ years, there have been <br />three coal mine waste disposal areas located north of Bowie Road. The first <br />pile, gob pile #1 which is discussed in detail in Permit Volume IV, was sized to <br />accept miscellaneous roof fall material and other minor amounts of high ash coal <br />encountered at the mine. There was a second coal mine waste disposal area, <br />gob pile #2, that was designed to handle refuse from the preparation plant along <br />with other miscellaneous high ash coal (TR -30 approved March 23, 2004). The <br />current approved design for gob pile #2 is to have side slopes no steeper than <br />3h:1v slopes with 15' wide terraces on 50' intervals with the first 50 foot lift <br />sloped no steeper than 2.5h:1v. During 2007 gob pile #2 was expanded to the <br />west (TR -44 approved March 20, 2007). The expansion of gob pile #2 added <br />about 500,000 cubic yards to the storage capacity. The expansion area is also <br />known as gob pile no. 4. There are a coverfill pile, topsoil stockpile, diversion & <br />collection ditches, and two sediment ponds associated with the disposal areas. <br />The total combined capacity of Gob piles #2 and #4 is approximately 3,300,000 <br />cubic yards. Under the current approved design, Gob Pile #2 will be expanded <br />to the west and north as shown on Figure 1. The draw, or gap, between Gob <br />Pile #2 and Gob Pile #4 will be filled in with coal mine waste. <br />There is a ridge above the draw that will be steepened in order to allow for more <br />gob storage. The hillside will be graded back at a 1.5h:1v for approximately 185 <br />feet. West Diversion Ditch #1 and #2 will be rerouted to follow the toe of the cut. <br />The expanded area will increase the storage capacity by approximately 600,000 <br />cubic yards. Approval of TR -89 allowed for re -locating the East Diversion Ditch, <br />and West Diversion ditch #2 higher up on the hillside. Gob will be placed in the <br />current location of the East Diversion ditch, and upon approval of TR -98 will be <br />placed in the draw north of the current gob pile location. This expanded area will <br />increase storage capacity by approximately 135,000 CY. <br />TR -98 - 1 - 01/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.