Laserfiche WebLink
Op,COCpp <br /> TRO4 <br /> $ COLT M1977-205 <br /> „ 3 Violations MINING AND SAFETY <br /> • � Complied± thmlawa <br /> 1s�r 12 Minor Infractions 1(303)866-3567 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> File No.: M- 1 977-205 Site Name:Trl-County Gravel <br /> County Delta TR# ORMS Use only) <br /> Permittee: Oldcastle SW Group, Inc. dba United Companies of MesIp 'ED <br /> Operator(If Other than Permittee): MAY 0 h 921 <br /> Permittee Representative:J aSo n B u rkey DIVISION OF RECLAMATION <br /> MINING AND SAFETY <br /> Please provide a brief description of the proposed revision: <br /> Adding a discharge pipe, parshall flume, and permanent ditch to the mining and reclamation plans for Tri-County <br /> Pit to control and measure discharges associated with the approved NPDES discharge point. All components of <br /> the planned installation are within the permit boundary and will be field fit to align with the approved reclamation <br /> plan. All proposed structures are permanent.As-builts to be supplied following construction. <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 1 1 Oc, 1 11, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock (not DMO) $175 ❑ <br /> I IOd, 112d(1, 2 or 3) $1006 ❑ <br />