Laserfiche WebLink
iii. Fertilization—types, mixtures, quantities, and time of application; <br /> The type and application rate of fertilizer shall be determined based on a soil test at the <br /> time of final reclamation. <br /> iv. Revegetation— types of trees, shrubs, etc.;and <br /> Please refer to the Reclamation and Landscape Plan Maps for the types, quantities and <br /> location of trees and shrubs to be planted. <br /> v. Topsoiling—specify anticipated minimum depth or range of depths for those areas <br /> where topsoil will be replaced. <br /> Topsoil will be uniformly placed and spread on all areas disturbed by the mining above the <br /> anticipated high water line. The minimum thickness shall be 6 inches above the <br /> surrounding finished grade. <br /> WEED MANAGEMENT PLAN <br /> Hunt Farms has a full-time weed manager on staff. This person is responsible for monitoring and <br /> controlling noxious weeds as they appear. Hunt Farms typically prefers to control weeds <br /> mechanically, by mowing and/or discing. If necessary, weeds will be killed with a contact <br /> herbicide. Hunt Farms has all of the necessary equipment in house to perform these tasks. <br /> Hunt Farms—WCR 40 Dirt Mine—MLRB 112 Permit Amendment Application <br /> Exhibit E-5 <br />