Laserfiche WebLink
41h Qtr 2020 GW/SW Report <br /> Review Memo No.2 <br /> Cresson Project(M1980-244) <br /> 14. Typically when a sample is filtered in the field all the equipment used is disposable, eliminating the <br /> need for decontamination. Please clarify what equipment required decontamination and indicate <br /> whether or not the appropriate detergent was used. <br /> 15. Response was adequate. <br /> 16. Please clarify whether or not a non-phosphatic detergent was used during the equipment <br /> decontamination as required in the QAPP, Appendix 7 of Amendment 13 Section 8.4. <br /> 17. Response was adequate. <br /> This concludes the Division's Adequacy Review No. 2 of the Fourth Quarter 2020 Groundwater and <br /> Surface Water Report.The Division reserves the right to further supplement this document with <br /> additional items and/or details as necessary. <br /> The due date for your response has been set for June 4, 2021. <br /> If you need additional information or have any questions, please contact me at Division of Reclamation, <br /> Mining and Safety, 1313 Sherman Street, Room 215, Denver, CO 80203, by telephone at 303-866-3567 <br /> x8114, or by email at patrick.lennbere@state.co.us. If you need additional information or have any <br /> questions, please let me know. <br /> Sincerely, <br /> /��-4—02 <br /> Patrick Lennberg <br /> Environmental Protection Specialist <br /> ec: Justin Raglin, Cripple Creek &Victor Gold Mine <br /> Ronald Parratt, Cripple Creek & Victor Gold Mine <br /> Michael Cunningham, DRMS <br /> Elliott Russell, DRMS <br /> Tim Cazier, DRMS <br /> Brock Bowles, DRMS <br /> Jared Ebert, DRMS <br />