My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-05-04_PERMIT FILE - M2020062
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2020062
>
2021-05-04_PERMIT FILE - M2020062
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 9:50:53 AM
Creation date
5/5/2021 6:18:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2020062
IBM Index Class Name
PERMIT FILE
Doc Date
5/4/2021
Doc Name
Decision Extension Request
From
Wasteline, Inc.
To
DRMS
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT C EXHIBIT D OF LEASE AGREEMENT <br /> EXHIBIT D <br /> LANDFILL BACKFILL <br /> SAND AND GRAVEL PLANT <br /> OBJECTIVE_ LESSOR plans to farm the acreage and the pit area after the <br /> expiration of the Lease. including any extensions. The pit area should be graded <br /> sufficiently to accommodate an irrigation pivot system. <br /> Phase 1: <br /> Crush and bring to grade existing surface the exposed gravel dirt located at the <br /> north end of the pit area_ LESSEE will cooperate with the agricultural <br /> landscaping objective and the agricultural landscaping company. hired by the <br /> LESSOR. to bring to grade the surface exposed gravel. <br /> Phase 2: <br /> Crush and bring to grade the exposed gravel dirt located at the mid-point of the <br /> pit area. LESSEE will cooperate with the agricultural landscaping objective and <br /> the agricultural landscaping company. hired by the LESSOR. to bring to grade <br /> the surface exposed gravel. <br /> Phase 3: <br /> Crush and bring to grade the exposed gravel dirt located at the south end of the <br /> pit area. LESSEE will cooperate with the agricultural landscaping ob;ectikâ˘e and <br /> the agricultural landscaping company, hired by the LESSOR. to bring to grade <br /> the surface exposed gravel. <br /> :Materials and Grade: <br /> LESSEE will use what topsoil backfill is available on site or supplied by <br /> LESSOR. LESSEE is not required to bring topsoil or backfill to the site. The <br /> excavated areas will be graded to 3 to I or less. If material is available. 6 <br /> inches of topsoil in the excavated areas. <br /> PROJECT: 5144.2 Schoen Farm Attachments to Response Letter 21 April 2021, Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.