Laserfiche WebLink
Bunn Ranch Pit TR4 April 2021 <br /> Weight description: Gravel-Pitrun <br /> Job Condition Correction Factor Source <br /> Operator Shill: 0.750 (AVG.) <br /> Material consistency: 0.900 (CAT HB)) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.700 (FND-MF) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.708 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.2777 <br /> Adjusted unit 586.09 LCY/hr <br /> production: <br /> Adjusted fleet 1172.18 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 2 Dozer(s) <br /> Unit cost: $0.556/LCY <br /> Total job time: 15.07 Hours <br /> Total job cost: $9,830 <br />