My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-05-03_PERMIT FILE - P2021008
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2021008
>
2021-05-03_PERMIT FILE - P2021008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 9:42:56 AM
Creation date
5/4/2021 6:16:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2021008
IBM Index Class Name
PERMIT FILE
Doc Date
5/3/2021
Doc Name
Application
From
Jim Guilinger
To
DRMS
Email Name
LJW
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> BLM Tres Rios Field Office recommends these data be determined with input given during the <br /> site visit with Fedenal and State peisannel. (Souice. iteni 3b. of BLM Ties Rius Field Office, <br /> response to initial NOI (case file number COC-80448) application.) <br /> The 2 drill pads and 350 feet of new road will be reclaimed by putting back the 314.8 cubic <br /> yards of material that were initially moved to create them (see III. 5 above). <br /> A one foot depth of topsoil will be removed and replaced for both roads and drill pads. The soil <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> A "spider" style hole plug will be inserted several feet down the drill hole which will then <br /> e filled with a bago en oni e to the su ace. Plugging will occur upon the completion <br /> of each drill hole. As stated in item III. 6. K above, the bottoms of the drill holes will be <br /> above water table. <br /> 5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> Not applicable. This project is a drilling program only. <br /> Form 2—Public File Page 9 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.