Laserfiche WebLink
5. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches, waste piles, drill pads and collar areas of underground workings,ponds, etc. <br /> Two 100 foot deep vertical reverse circulation drill holes with each drill site requiring a 50x50 <br /> foot drill pad (1 foot deep). The two drill sites will require two roads built of less than 200 feet <br /> Penh (350 feat total) along very gentIV Sloping nT roi ind <br /> Arnount of rnateiial to be moved. 2 diiii pads x 50ft x 50ft-X-1ft deep - 185.2 cubic yards of <br /> material moved. The new roads would move 350 ft long x 10 ft wide x 1 ft deep = 129.6 cubic <br /> yards of material moved <br /> The grand total of material moved is 314.8 cubic yards. <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes, diameter, depth, location, etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Average Average <br /> Quantity 2 Width (ft) 50 Length (ft) 50 <br /> B. Drill Holes: <br /> Diameter <br /> Quantity 2 Depth (ft) 100 (in) approx 6 <br /> C. Mud Pits <br /> Average Average Average <br /> Quantity 0 Width (ft) n/a Length (ft) n/a Depth (ft) n/a <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance, describe type, quantity and general dimensions: <br /> None <br /> Form 2—Public File Page 6 of 14 <br />