Laserfiche WebLink
d. All remaining above grade berms will be either eliminated by haul off or be <br /> used in final reclamation for revegetation with the exception of the North <br /> Berm associated with the spillway and slurry wall construction. <br /> 4. Timetable for completing remaining reclamation work broken down by task/area. <br /> AREA A— Consists of the area around and adjacent to ski lake (Exhibit C.) <br /> August 2021—Apply herbicide as needed. <br /> Sept-Dec 2021: <br /> Discing or Ripping as required; <br /> Introduction of soil amendments as required; <br /> Drill seed or straw mulch and crimping based on best practices. <br /> Establish vegetation based on environmental conditions to be <br /> determined. Hall-Irwin will need to monitor for revegetation growth and <br /> possibly amend or spot seed as required to get final vegetation <br /> established. This will affect the final schedule. <br /> AREA B - Remaining site as shown on Exhibit C. <br /> August 2021—Apply herbicide as needed. <br /> Sept-Dec 2021: <br /> Discing or Ripping as required; <br /> Introduction of soil amendments as required; <br /> Drill seed or straw mulch and crimping based on best practices. <br /> Establish vegetation based on environmental conditions to be <br /> determined. Hall-Irwin will need to monitor for revegetation growth and <br /> possibly amend or spot seed as required to get final vegetation <br /> established. This will affect the final schedule. <br /> A Google Earth map of the current site features is shown on Exhibit D. <br /> Once you have reviewed the enclosed documents; should you have questions or comments, <br /> feel free to contact the undersigned. <br /> Sincerely, <br /> Ed Lafferty <br /> V.P. of Construction <br /> Enclosures <br />