Laserfiche WebLink
of Co4O <br /> COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> * � 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 876 REC► <br /> , eym <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET APR 3 0 2021 <br /> 1997-058 Baseline Resource OMSIONOFRFCL4W% <br /> File No.: M- Site Name: MINING ANr)SAFE <br /> County Weld TR# (DRMS Use only) <br /> Permittee: Hall-Irwin Aggregates, LLC <br /> Operator (If Other than Permittee): <br /> Permittee Representative: Ed Lafferty <br /> Please provide a brief description of the proposed revision: <br /> Update map of permit area correcting previous versions and depicting permit area and <br /> existing site feat,ires-,- 1 1pdate the it-gal description; lip iate the reclamation plan and maps <br /> from the 1997 version. <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a 1R; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 11 Oc, 1 11, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock (not DMO) $175 <br /> 1 IOd, 1 12d(1, 2 or 3) $1006 <br />