Laserfiche WebLink
M-2019-028—J-2 Contracting Co.—DPG Pit—Technical Revision Request No. 1 <br /> April23, 2021 <br /> -3- <br /> Exhibit L - Reclamation Bond Calculations: Revision to the Reclamation Bond Calculations for <br /> the updated mine phases. <br /> Updated reclamation bond calculations, Exhibit L Reclamation Bond Summary Table, and Exhibit L <br /> Reclamation Phasing Map are attached. <br /> J-2 Contracting Co. appreciates your consideration of this technical revision request and looks forward <br /> to your response. <br /> Please feel free to contact me with any questions or comments. <br /> Sincerely, <br /> , e. <br /> J.C. York, P. <br /> AT Consultlng,Inc. <br /> Attachments: <br /> $216 Check for Technical Revision review fee <br /> 1. Exhibit A—Legal Description <br /> 2. Permit Boundary Change Map <br /> 3. Exhibit C—Pre-Mining /Mining Plan Maps <br /> 4. Exhibit D—Mining Plan Narrative <br /> 5. Exhibit E—Reclamation Plan Narrative <br /> 6. Exhibit F—Reclamation Plan Maps <br /> 7. "Delta Reservoir West Cell Preliminary and East Cell Conceptual Design" memorandum by Galloway, <br /> dated April 16, 2021 <br /> 8. Exhibit L—Reclamation Cost Narrative and Summary Table <br /> 9. Reclamation Bond Calculations <br /> 10. Exhibit L—Reclamation Phasing Map <br /> 11. "Stability Analysis for Gravel Mine, East of Greeley" by Civil Resources, dated February 1, 2021. <br /> Cc: J-2 Contracting Co. <br /> File <br /> V 305 Denver Avenue—Suite D•Fort Lupton CO 80621 •Ph: 303-857-6222•Fax: 303-857-6224 <br />