Laserfiche WebLink
EXHIBIT F <br /> Rule 6.3.6 <br /> List of Other Permits and Licenses Required <br /> As the Applicant intends to mine less than 70,000 tons per year of product material, an air <br /> quality permit will not be required. The Applicant will file a Mining Operations APEN prior to <br /> starting construction. All stormwater will drain into the extraction pit and will be absorbed into <br /> the ground within 72 hours. As there will be no discharge of stormwater into surface waters or <br /> groundwater, no stormwater permit is required.No other state permits are required. Weld County <br /> will be notified of the operation but does not require a land use or zoning permit. <br /> Oak Creek Consulting and Production Services,LLC Page lof l <br /> Construction Materials Limited Impact(110(c))Operation Reclamation Permit Application Form <br />