Laserfiche WebLink
Excavated gravel materials will be crushed on-site using a portable crusher by an independent <br /> contractor retained by the Applicant. The crusher will be located on the western side of the <br /> gravel pit site, as indicated on the Mining Plan Map. Prior to loading and transport away from <br /> the site, crushed materials will be stockpiled on the west side of the site, as indicated on the <br /> Mining Plan Map.No other facilities or chemicals of any sort will be utilized during any portion <br /> of the excavation,processing, or loading/transport processes. <br /> (n) Commodities to be Extracted and their Use: <br /> The only commodities to be extracted at this site will be sand and gravel. The rock will be used <br /> for construction purposes. <br /> I <br /> (o) Incidental Products: <br /> Minimal quantities of borrow may be mined or produced,which may be transported off-site to be <br /> used as general fill.No other incidental products will are expected to be mined or produced from <br /> the site. <br /> (p) Explosives: <br /> No explosives will be used at the site. <br /> Attachments: <br /> Exhibit C-1: Mining Plan Map <br /> Exhibit C-2: Stormwater Management Plan <br /> Oak Creek Consulting and Production Services,LLC Page 4of 4 <br /> Construction Materials Limited Impact(I I0(c))Operation Reclamation Permit Application Form <br />