My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-04-19_REVISION - M1983194
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983194
>
2021-04-19_REVISION - M1983194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 9:11:16 AM
Creation date
4/20/2021 7:04:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
REVISION
Doc Date
4/19/2021
Doc Name
Request for Technical Revision
From
Natural Soda, LLC
To
DRMS
Type & Sequence
TR46
Email Name
ACY
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of.cow <br /> y M 1983-194 TR46 <br /> * C IN, MINING AND SAFETY <br /> /Complied! 0 Violations )3 ph(303)866-3567 <br /> 1 Minor Infraction <br /> '876 ACY/thm/awa <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> File No.: M- 1983-194 ' site Name: Natural Soda Nahcolite Project <br /> Count y Rio Blanco-" TR# 6QRAQ.Usg onl <br /> Permittee: <br /> Natural Soda LLC rXCUEIVED <br /> APR <br /> 19 2021 <br /> Operator(If Other than Permittee): <br /> uIvINON OF RECLAMATION <br /> Gerald Daub, Daub & Associates, Inc. /MININGANDSAFETY <br /> Permittee Representative: <br /> Please provide a brief description of the proposed revision: <br /> See attached <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tyne Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, I I2d(1, 2 or 3) $1006 ❑✓ <br />
The URL can be used to link to this page
Your browser does not support the video tag.