Laserfiche WebLink
T3 j <br /> tcc*Tank <br /> Map I. SL7 bond release block is depicted in light green, the dark green <br /> area depicts the SL6 bond release block. <br /> Evaluation of Hydrologic Impacts <br /> Rule 3.03.2(2) requires the Division to evaluate hydrologic impacts prior to releasing reclamation liability. <br /> This evaluation considers whether pollution of surface or subsurface water is occurring and the probability <br /> of future occurrence of such pollution. The Division's evaluation based on Annual Hydrology Reports, and <br /> pond inspections is summarized below. Drainage structures are routinely inspected and cleaned out as <br /> necessary. The SPL monitoring plan can be referenced in Tab 15 and Probable H drologic <br /> Consequences are discussed in Tabs 16, 17 and 18. <br /> Permit Number: C1982057 Page 13 of 15 <br /> Phase III <br />