Laserfiche WebLink
16)Man provide an estimate of the actual costs to reehtim the ske based on what it would <br /> cost the State of Cokwade using an independent contractor to complete reclamation. The <br /> Office adds up to an additional maximum eighteen and one half(IL5`/.)percent of that <br /> total. which includes a private contract,typical overhead casts and profit, <br /> Direct Cost: <br /> i. Backfilling: `00 tcubic yards)X S S (conper Yard)- Total S 1000 <br /> n Grading: Sty (cubic yards)X S 10 (cost per yard) Total SSW <br /> iii. 'Topsoil: St) (cubic yards)X S 10 (cost per yard) M Total S 5W <br /> iv. Seeding: 2 (acres)X S 500 (cost per acre)-x Total$ 1000 <br /> v. Mobilization: (Pieces of equipnwu)X S SW (cat per equipment) <br /> Todd S 100(} <br /> Direa Cost Subtotal: S 4000 <br /> Division's total overhead cost: X 18.5% <br /> Division's Total cost: S 4,740W <br /> Note: Based on the Divisions experience the required financial warranty is normally set at <br /> approximately$2.50t?per acre. Therefore,a typical 5 acre permit will have a total required financial <br /> warranty in the amount of$12,5W. <br />