Laserfiche WebLink
EXHIBIT D - Reclamation Plan <br /> Rule 6.3.4 <br /> The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will <br /> be used to reclaim the affected land to the proposed future land use. This plan must be correlated to <br /> Exhibit E - Map. <br /> 1) Primary future (Post-mining) land use(check one): <br /> F Cropland (CR) Pastureland (PL) General Agriculture (GA) <br /> F-1 Rangeland (RL) Forestry (FR) Wildlife Habitat(WL) ** <br /> F Residential (RS) F� Recreation (RC) Industrial/Commercial (IC) <br /> n Developed Water Resource (WR) <br /> **Note: The Colorado Parks & Wildlife (CPW) must be consulted where wildlife use is the <br /> proposed future land use. <br /> 2) Please provide a general description of how the mined area will be reclaimed: <br /> Area A:Topsoil will be relaced and area planted with grass seed mix specified below in Item 7 <br /> Area B: Topsoil will be relaced and area planted with wheat crop. <br /> 3) Specify which ponds, streams, roads and buildings, if any, will remain after reclamation. <br /> These features must be shown on the Exhibit E- Map: <br /> Drainage Pond. Clarification: The drainage pond is an existing feature that is not part of the <br /> permitted area. <br /> Note: if ponds are a part of the Reclamation Plan, slopes from 5 vertical feet above to 10 <br /> vertical feet below the expected average water level cannot be steeper than 3H:1 V; remaining <br /> slope lengths may not be steeper than 2H:1 V (see example sketch below). <br /> ....................._........................ ............... <br /> 5' <br /> I <br /> 10, 1 <br /> � l <br />