My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-04-09_HYDROLOGY - M1977208
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977208
>
2021-04-09_HYDROLOGY - M1977208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2024 10:17:58 AM
Creation date
4/12/2021 6:47:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977208
IBM Index Class Name
HYDROLOGY
Doc Date
4/9/2021
Doc Name
Water Monitoring - Groundwater
From
CEMEX
To
DRMS
Annual Report Year
2020
Report Quarter_Month
4
Email Name
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DECEIVED <br /> ZZCC-Max APR 09 2021 <br /> Building a better future DIVISION OF RECLAMATION <br /> MINING AND SAFETY <br /> April 7, 2021 <br /> Ms.Amy Eschberger Via FEDEX <br /> Division of Reclamation, Mining and Safety TRK #7733 78o8 2.335 <br /> Environmental Protection Specialist <br /> 133.3 Sherman Street, Room 23.5 <br /> Denver, Colorado 802O3 <br /> Re: CEMEX Lyons Mine Permit M-3-977-208 <br /> Technical Revision No. 3.2, Revised Groundwater Monitoring Plan <br /> Fourth Quarter 2020 Monitoring Data <br /> Dear Ms. Eschberger: <br /> This letter transmits the surface water and groundwater data associated with the sampling of the <br /> cement kiln dust disposal area (C-Pit). This report includes data from the C-Pit ponded water and <br /> related groundwater monitoring for the first quarter of 2021, covering the reporting period from <br /> January 1,2021.to March 31, zozz. Table i presents data for the last four quarters. <br /> Groundwater samples were collected on March 2, 2021 from the CEM-ooz and CEM-004 groundwater <br /> monitoring wells and from the C-Pit ponded water. The inspection of groundwater monitoring well <br /> CEM-oo5 on March 2, 2021 indicated that there was not enough water volume to collect a <br /> representative sample. <br /> The samples collected from C-Pit ponded water and the groundwater monitoring wells were analyzed <br /> for pH, chloride, sulfate, total dissolved solids, selenium, and thallium. The reported pH data are based <br /> on the pH analyses performed at the time of sample collection in the field (Table 3.). The measured pH <br /> at groundwater monitoring well CEM-004 and analytical results for chloride, sulfate,total dissolved <br /> solids(TDS), selenium and thallium from the March 2, 2021 groundwater sample were within the <br /> target levels prescribed by TR-zz, as shown in Table i. <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.