My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-04-09_REVISION - M2012004
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012004
>
2021-04-09_REVISION - M2012004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 8:45:45 AM
Creation date
4/12/2021 6:46:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012004
IBM Index Class Name
REVISION
Doc Date
4/9/2021
Doc Name
Adequacy Review Response
From
Superior Oilfield Servoces, Co.
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit L Reclamation Costs <br /> Reclamation will be completed when feasible during the mining of the site <br /> if it can be done without interuption to the mining activities. As decribed <br /> the site will be returned to cropland as was it's previous use. Any <br /> reclamation not completed during the mining will be done at the <br /> completion of the mining activities. The rough grading and sloping will be <br /> accomplished during the mining activities leaving the final grading and <br /> topsoil placement as the last item to address. Topsoil will be placed at the <br /> designed depth of 6" by scraper and finished graded by a blade to achieve <br /> the final product. Area will then be seeded with corn or wheat as directed by the <br /> farmer. <br /> Volumes / Areas <br /> 39.36 acres to be reclaimed <br /> 32,400 cubic yards of topsoil to be placed at a depth of 6" <br /> over the 39.36 acres. <br /> Unit Costs <br /> topsoil placement with scraper $1.50 per cu yd <br /> blade per hour $150.00 per hour <br /> mob/demob from Greeley $500.00 per round trip <br /> planting/either corn or wheat $275.00 per acre <br /> Direct Costs <br /> 32,400 cu yds topsoil placement @ $1.50/cu yd $48,600 <br /> 60 hours blade time @ $150.00/ hr $9,000 <br /> 8 round trips @ $500.00/trip $4,000 <br /> planting 39.36 acres @ $275.00 per acre 10,824 <br /> Total Direct Costs $72,424 <br /> Indirect Costs <br /> Insu ran ce/Bond/Superintendant/Profit @ 18% $13,036 <br /> Legal/ Engineering/Project Management @ 14% $10,139 <br /> Contingency $0 <br /> Total Indirect Costs $23,176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.