Laserfiche WebLink
Mill <br /> Task Description: Mobilize/Demobilize Task# 012 <br /> Site: Gladstone Mill <br /> EQUIPMENT TRANSPORT RIG COST <br /> Rig Capacities: 0-25 Tons <br /> Unit Cost:j 88.67 <br /> NON ROADABLE EQUIPMENT <br /> Haul trip Return Trip DOT Permit <br /> Machine Weight/Tons cost/hr/fleet cost/hr/fleet cost/fleet <br /> CAT 950 20.13 $ 184.07 $ 88.67 $ 250.00 <br /> Subtotal $ 184.07 $ 88.67 $ 250.00 <br /> EQUIMENT HAUL DISTANCE AND TIME <br /> Idaho Springs 2 miles one-way <br /> Average speed 40 mph <br /> Transportion Cycle Time Hours <br /> Non-Roadable <br /> Haul time: 0.25 <br /> Return time: 0.25 <br /> Loading time: 0.25 <br /> Unloading time: 0.25 <br /> Subtotals:1 1 <br /> Total Non-Roadable Cost: $ 522.74 <br /> JOB TIME AND COST <br /> Total time: 2 <br /> Total cost: $ 522.74 <br />