Laserfiche WebLink
Exhibit D Rev. 2 <br /> Quantity = 42,000 cubic yards <br /> Equipment: Self-loading scraper (similar to CAT 623) <br /> Dozer (similar to CAT D6) <br /> Labor: 2 equipment operators and time foreman <br /> Production rate: 150 cubic yards per hour <br /> Hours required to complete = 42,000/150 = 280 hours <br /> Equipment costs per hour = $ 240.00 <br /> Labor costs per hour = $ 150.00 <br /> Total per hour = $ 390.00 <br /> Equipment and Labor Total = 280 hours x $390 =$109,200 <br /> Mobilization: 2 pieces in and out = $ 1 ,200.00. <br /> TOTAL for this item = $ 110,400 or $ 2.63/cubic yard. <br /> (No markup) <br /> 2. Seedbed preparation, application of soil amendments, seed <br /> and mulch. <br /> The cost of performing these items, based on a quote <br /> from CDI is: <br /> Straw mulch $ 500/acre <br /> Tackifier $ 1100/acre <br /> Seed : $ 375/acre <br /> Total = $ 1,975/acre <br /> TOTAL for this item = 32.0 acres x $1 ,975/acre = $63,200 <br /> Total Cost to reclaim site = $110,400 + $63,200 = $173,600. <br /> Page 3 of 4 <br />