My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-04-07_PERMIT FILE - M2021019
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021019
>
2021-04-07_PERMIT FILE - M2021019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 8:37:33 AM
Creation date
4/8/2021 6:46:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021019
IBM Index Class Name
PERMIT FILE
Doc Date
4/7/2021
Doc Name
Adequacy Review Response
From
Ames Construction, Inc.
To
DRMS
Email Name
JPL
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit D Rev. 2 <br /> Quantity = 42,000 cubic yards <br /> Equipment: Self-loading scraper (similar to CAT 623) <br /> Dozer (similar to CAT D6) <br /> Labor: 2 equipment operators and time foreman <br /> Production rate: 150 cubic yards per hour <br /> Hours required to complete = 42,000/150 = 280 hours <br /> Equipment costs per hour = $ 240.00 <br /> Labor costs per hour = $ 150.00 <br /> Total per hour = $ 390.00 <br /> Equipment and Labor Total = 280 hours x $390 =$109,200 <br /> Mobilization: 2 pieces in and out = $ 1 ,200.00. <br /> TOTAL for this item = $ 110,400 or $ 2.63/cubic yard. <br /> (No markup) <br /> 2. Seedbed preparation, application of soil amendments, seed <br /> and mulch. <br /> The cost of performing these items, based on a quote <br /> from CDI is: <br /> Straw mulch $ 500/acre <br /> Tackifier $ 1100/acre <br /> Seed : $ 375/acre <br /> Total = $ 1,975/acre <br /> TOTAL for this item = 32.0 acres x $1 ,975/acre = $63,200 <br /> Total Cost to reclaim site = $110,400 + $63,200 = $173,600. <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.