My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-04-05_PERMIT FILE - M2021021
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021021
>
2021-04-05_PERMIT FILE - M2021021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2025 4:10:09 AM
Creation date
4/6/2021 8:22:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021021
IBM Index Class Name
PERMIT FILE
Doc Date
4/5/2021
Doc Name
Application
From
IHC Scott, Inc.
To
DRMS
Email Name
ACY
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rifle Gravel Pit#1 March 2021 <br /> k <br /> Q Dewetr' •rd%V*k A Jr V Our,nqgStage 1 M,n,n4 <br /> f%timatod Drawdawn of Groundwater l@vwl%Following 1 Year of Continuous flewator9nt 3 wells a1]efs/vwll <br /> Figure 11. Estimated Drawdown of Groundwater Levels Following 1 year of Continuous <br /> Dewatering (estimated 3 wells) <br /> 5.2.2.4 Explosives <br /> Explosives will not be used during mining or reclamation of the property. <br /> 5.2.3 Mining Extraction (Phase 3—in 2 Stages) <br /> Initial mining extraction operations will take place in 2 extraction stages and include the <br /> areas east of the delineated wetlands. Fencing will be installed at least 10-feet away from <br /> the tailwater channel and wetlands to prevent disturbance of these resources. <br /> Stage 1 of the mining extraction operation will start in the southeastern quadrant of the site, <br /> depicted in the Drawings in Attachment A. At this location, the crusher will be placed at <br /> existing grade as excavation proceeds down to the lowest elevation of the gravel. When <br /> enough material has been excavated in Stage 1, the crusher will be moved to the mining pit <br /> floor. Stage 2 will take place in the northeastern quadrant of the property. <br /> Scott will also monitor the response of the delineated wetlands on the property over the <br /> course of Phase 3 to determine if the wetlands are supported entirely by agricultural water <br /> (i.e. non-jurisdictional). If the wetlands are determined to be non-jurisdictional, Scott intends <br /> 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.