Laserfiche WebLink
Rifle Gravel Pit #1 Ma[ch 2,021 <br /> 52 11 Topsoil and Overburden Handling 15 <br /> 52 12 Water Handling and Dewatering 16 <br /> 522 Mining Preparation(Phase 2) 19 <br /> 5 2 2 1 Topsoil and Overburden Handling 19 <br /> 5 2 2 2 Water Handling and Dewatering 19 <br /> 5 2 2 3 Schedule of Operations 19 <br /> 5 2 2 4 Explosives 20 <br /> 5 2 3 Mining Extraction (Phase 3—in 2 Stages) 20 <br /> 5 2 3 1 Stockpiling and Overburden Handling 21 <br /> 5 2 3 2 Water Handling and Dewatering 21 <br /> 5 2 3 3 Schedule of Operations 21 <br /> 5 2 4 Reclamation (Phase 4) 21 <br /> 5.3 Mining Timetable 21 <br /> 6.0 Exhibit E—Reclamation Plan 23 <br /> 6.1 Description and Types of Reclamation 23 <br /> 6.2 Post-Mining Land Use 23 <br /> 6.3 Implementation of the Reclamation Plan 23 <br /> 6 3 1 Topsoil Segregation, Preservation, and Replacement 23 <br /> 6 3 2 Final Grading 24 <br /> 6 3 3 Seeding 24 <br /> 6 3 3 1 Temporary Seed Mix 24 <br /> 6 3 3 2 Long-Term/Permanent Seed Mix 24 <br /> 634 Fertilization 26 <br /> 6 3 5 Revegetation 26 <br /> 6 3 6 Topsoding 26 <br /> 6.4 Revegetation Success Criteria 26 <br /> 6.5 Noxious Weed Control 26 <br /> 6.6 Reclamation Plan Schedule 27 <br /> 6 6 1 Previously Disturbed/Unnecessary Areas 27 <br /> 662 Active Mining Areas 27 <br /> 6.7 Monitoring Reclamation Success 27 <br /> 7.0 Exhibit F—Reclamation Plan Map 28 <br /> 8.0 Exhibit G —Water Information 29 <br /> 8.1 Dewatering 29 <br /> 81 1 Dewatering Pumping Information 29 <br /> 8.2 Aquifers 30 <br /> 8.3 Groundwater 30 <br /> 8.4 Surface Water 31 <br /> ii <br />