Laserfiche WebLink
GSL Sand & Gravel Substitute Water Supply Plan  Page 3 of 5   <br />April 5, 2021   <br />   <br />The current financial warranty posted for the site is $368,590, which was set by DRMS after                  <br />approving an amendment request to change the reclamation plan from water storage to an inert                 <br />backfill operation on the property (to two feet above the water table). This action satisfied the                  <br />requirement that the Applicant diligently pursue compliance with their DRMS permit and the               <br />requirements described in the April 30, 2010 letter DRMS sent to all gravel pit operators                 <br />(attached), specifically in regard to the required financial warranty at the site. With each                <br />successive SWSP renewal request, the Applicant shall demonstrate continued diligence in this              <br />effort, including maintaining satisfactory status in obtaining proper bonds through DRMS .    <br />   <br />Conditions of Approval   <br />   <br />I hereby approve this substitute water supply plan, in accordance with section 37-90-137(11),               <br />C.R.S., subject to the following conditions:   <br />   <br />1.This SWSP is approved with the effective date of November 1, 2020 and shall be valid                  <br />through October 31, 2021 unless otherwise revoked or superseded by a decree. If this plan is                  <br />not decreed in water court by the SWSP expiration date, a renewal request must be submitted                  <br />to this office with the statutory fee of $257 no later than September 15, 2021. If a renewal                    <br />request is received after the expiration date of this plan, it will be considered a request                  <br />for a new SWSP and a filing fee of $1,593 will be required.    <br />2.Well permit no. 57723-F is in good standing for the current use and exposed surface area at the                    <br />site in accordance with sections 37-90-137(2) and (11), C.R.S.   <br />3.The total surface area of the groundwater exposed at the site must not exceed 2.10 acres                  <br />during the approval period of this SWSP, resulting in annual evaporative losses of 6.00                <br />acre-feet.    <br />4.This SWSP does not permit any water use for dust control, aggregate production or any other                  <br />purpose, other than evaporation.   <br />5.Total consumption at the site must not exceed the aforementioned amounts unless an               <br />amendment is made to this plan.   <br />6.Approval of this plan is for the purposes as stated herein. Any additional uses of this water                   <br />must first be approved by this office.   <br />7.All releases of replacement water must be sufficient to cover all out-of-priority depletions in                <br />time, place, and amount and must be made under the direction and/or the approval of the                  <br />Water Commissioner. The release of replacement water may be aggregated to maximize              <br />beneficial use. The Water Commissioner and/or the Division Engineer shall determine the rate               <br />and timing of an aggregated release.   <br />8.All diversions shall be measured in a manner acceptable to the Division Engineer. The                <br />Applicant shall install and maintain such measuring devices as required by the Division               <br />Engineer for operation of this SWSP. In addition, the applicant shall maintain daily records of                 <br />all diversions, replacements, and the amount of water used for each particular purpose. The                <br />applicant shall provide a report of these records to the Division Engineer              <br />( Div1Accounting@state.co.us ), River Operations & Compact Coordinator        <br />( Brent.Schantz@state.co.us ) and the Water Commissioner (Jorge Vidal at          <br />Jorge.Vidal@state.co.us ) on a monthly basis. The accounting must be submitted within 30              <br />calendar days of the end of the month for which the accounting is being made and conform to