My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-04-05_HYDROLOGY - M2001085
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2001085
>
2021-04-05_HYDROLOGY - M2001085
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2021 10:14:08 AM
Creation date
4/5/2021 10:13:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001085
IBM Index Class Name
Hydrology
Doc Date
4/5/2021
Doc Name
Substitute Water Supply Plan
From
DWR
To
DRMS
Email Name
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GSL Sand & Gravel Substitute Water Supply Plan Page 3 of 5 <br />April 5, 2021 <br /> <br />The current financial warranty posted for the site is $368,590, which was set by DRMS after <br />approving an amendment request to change the reclamation plan from water storage to an inert <br />backfill operation on the property (to two feet above the water table). This action satisfied the <br />requirement that the Applicant diligently pursue compliance with their DRMS permit and the <br />requirements described in the April 30, 2010 letter DRMS sent to all gravel pit operators <br />(attached), specifically in regard to the required financial warranty at the site. With each <br />successive SWSP renewal request, the Applicant shall demonstrate continued diligence in this <br />effort, including maintaining satisfactory status in obtaining proper bonds through DRMS . <br /> <br />Conditions of Approval <br /> <br />I hereby approve this substitute water supply plan, in accordance with section 37-90-137(11), <br />C.R.S., subject to the following conditions: <br /> <br />1.This SWSP is approved with the effective date of November 1, 2020 and shall be valid <br />through October 31, 2021 unless otherwise revoked or superseded by a decree. If this plan is <br />not decreed in water court by the SWSP expiration date, a renewal request must be submitted <br />to this office with the statutory fee of $257 no later than September 15, 2021. If a renewal <br />request is received after the expiration date of this plan, it will be considered a request <br />for a new SWSP and a filing fee of $1,593 will be required. <br />2.Well permit no. 57723-F is in good standing for the current use and exposed surface area at the <br />site in accordance with sections 37-90-137(2) and (11), C.R.S. <br />3.The total surface area of the groundwater exposed at the site must not exceed 2.10 acres <br />during the approval period of this SWSP, resulting in annual evaporative losses of 6.00 <br />acre-feet. <br />4.This SWSP does not permit any water use for dust control, aggregate production or any other <br />purpose, other than evaporation. <br />5.Total consumption at the site must not exceed the aforementioned amounts unless an <br />amendment is made to this plan. <br />6.Approval of this plan is for the purposes as stated herein. Any additional uses of this water <br />must first be approved by this office. <br />7.All releases of replacement water must be sufficient to cover all out-of-priority depletions in <br />time, place, and amount and must be made under the direction and/or the approval of the <br />Water Commissioner. The release of replacement water may be aggregated to maximize <br />beneficial use. The Water Commissioner and/or the Division Engineer shall determine the rate <br />and timing of an aggregated release. <br />8.All diversions shall be measured in a manner acceptable to the Division Engineer. The <br />Applicant shall install and maintain such measuring devices as required by the Division <br />Engineer for operation of this SWSP. In addition, the applicant shall maintain daily records of <br />all diversions, replacements, and the amount of water used for each particular purpose. The <br />applicant shall provide a report of these records to the Division Engineer <br />( Div1Accounting@state.co.us ), River Operations & Compact Coordinator <br />( Brent.Schantz@state.co.us ) and the Water Commissioner (Jorge Vidal at <br />Jorge.Vidal@state.co.us ) on a monthly basis. The accounting must be submitted within 30 <br />calendar days of the end of the month for which the accounting is being made and conform to
The URL can be used to link to this page
Your browser does not support the video tag.