My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-04-02_PERMIT FILE - M2021019 (12)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021019
>
2021-04-02_PERMIT FILE - M2021019 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 8:21:49 AM
Creation date
4/5/2021 9:00:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021019
IBM Index Class Name
PERMIT FILE
Doc Date
4/2/2021
Doc Name
Incompleteness Response
From
Ames Construction, Inc.
To
DRMS
Email Name
JPL
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HORROCKS <br /> 11-11 <br /> E N G I N E E R S <br /> MEMORANDUM <br /> TO: Ames Construction,Inc. <br /> 18485 E 28th Ave. <br /> Aurora,CO 80011 <br /> Attn: Kirk Bergstrom <br /> FROM: Micah Leadford <br /> DATE: March 31, 2021 <br /> SUBJECT: Burnham Property Borrow Pit <br /> Ames Project#210603—Lemay Realignment over BNSF and Vine Drive <br /> Weld County Road 110 <br /> Dear Mr. Bergstrom: <br /> In accordance with the State of Colorado, Division of Reclamation, Mining, and Safety Reclamation <br /> Permit Application Package, any structure within 200 feet of a proposed mine site shall either have a <br /> Structural Agreement between the structure owner and the applicant,or an appropriate engineering <br /> evaluation that demonstrates the structure shall not be damaged by activities occurring at the mine site. <br /> Weld County Road 110 belonging to Weld County Public Works is within 200 feet of the planned limits <br /> of the borrow site. I have reviewed the proposed boundary limits within the application,the scope of <br /> work planned at the proposed mine site, and the permanent man-made structures. Based on your <br /> proposed mining method of mechanical excavation (blasting operations are not planned), planned <br /> mining depths, as-excavated and final slope ratio (4:1, H:V) and the horizontal separation from the <br /> mining limits to the structures, in my opinion the scope of work at the planned mine will have no <br /> adverse effect on nor would it damage the structure. <br /> If you have any questions or would like additional information regarding this memorandum, please do <br /> not hesitate to contact me at 303-967-0353. <br /> Sincerely, <br /> DN agreE Dy Micah LaeMaE <br /> ON C.US <br /> 0.Namc <br /> Micah Leadforda� h��w am, <br /> k+Eigimers CN-Mran <br /> LaaEMtl <br /> 1 am 03 1 3 15 q tlus OocumerM <br /> � 21 10 11-05'00' <br /> Micah Leadford, PE <br /> Horrocks Project Manager <br /> 303-967-03531 Horrocks com <br /> n,R70(raannrnnri Playa RniIpv:4H Ridta 195W (rPPnlPonr)d VIIIAn,- Ctl kni11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.