My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-04-02_PERMIT FILE - M2021019 (12)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021019
>
2021-04-02_PERMIT FILE - M2021019 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 8:21:49 AM
Creation date
4/5/2021 9:00:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021019
IBM Index Class Name
PERMIT FILE
Doc Date
4/2/2021
Doc Name
Incompleteness Response
From
Ames Construction, Inc.
To
DRMS
Email Name
JPL
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HORROCKS <br /> II-II <br /> E N G 7N E E R S <br /> MEMORANDUM <br /> TO: Ames Construction, Inc. <br /> 18485 E 28th Ave. <br /> Aurora,CO 80011 <br /> Attn: Kirk Bergstrom <br /> FROM: Micah Leadford <br /> DATE: March 31, 2021 <br /> SUBJECT: Burnham Property Borrow Pit <br /> Ames Project#210603—Lemay Realignment over BNSF and Vine Drive <br /> Nunn Telephone Company-Fiber Optic <br /> Dear Mr. Bergstrom: <br /> In accordance with the State of Colorado, Division of Reclamation, Mining, and Safety Reclamation <br /> Permit Application Package, any structure within 200 feet of a proposed mine site shall either have a <br /> Structural Agreement between the structure owner and the applicant, or an appropriate engineering <br /> evaluation that demonstrates the structure shall not be damaged by activities occurring at the mine site. <br /> The fiber optic line belonging to Nunn Telephone is within 200 feet of the planned limits of the borrow <br /> site. I have reviewed the proposed boundary limits within the application,the scope of work planned at <br /> the proposed mine site, and the permanent man-made structures. Based on your proposed mining <br /> method of mechanical excavation (blasting operations are not planned), planned mining depths, as- <br /> excavated and final slope ratio (4:1, H:V) and the horizontal separation from the mining limits to the <br /> structures, in my opinion the scope of work at the planned mine will have no adverse effect on nor <br /> would it damage the structure. <br /> If you have any questions or would like additional information regarding this memorandum, please do <br /> not hesitate to contact me at 303-967-0353. <br /> Sincerely, <br /> 9M69n Ey Miceli Leatllwd <br /> S <br /> Micah Leadford 0. 'E <br /> 0.Nmpcks E.ginam LN-Miran <br /> f4cw1 am approvnp IN,Eowment <br /> TM"--`D!•4Mt 03115373PWW' <br /> Micah Leadford, PE <br /> Horrocks Project Manager <br /> 303-967-0353 Horrocks corn <br /> FR7n(,raan+n/nnri P1a7A RNIIPvArri Cuita 19W1 (;raarnnrnnrl VIIIanP (.o An111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.