Laserfiche WebLink
' Mobilization Worksheet Cont'd Task#004 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: AULT,CO <br /> Total one-way travel distance: 7.00 miles <br /> Average Travel Speed: 35.00 mph <br /> Total Non-Roadable Mob/Demob Cost * $1,725.75 <br /> `*two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** $49.00 <br /> ** one round trip,no haul rig: <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 0.20 0.20 <br /> Return Time(Hours): 0.20 0.20 <br /> Loading Time(Hours): 1.00 NA <br /> Unloading Time(Hours): 1.00 NA <br /> Subtotals: 2.40 0.40 <br /> JOB TIME AND COST <br /> Total job time: 4.80 Hours <br /> Total job cost: $1,775 <br /> CIRCES Cost Estimating Software <br />