Laserfiche WebLink
Construction inateriai Special 111 Operation Reclamation Exhibits <br /> Raindance Reservoir#2 —VIMA Partners, LLC <br /> practices as defined in the Mile High Flood District Criteria Manual will be <br /> utilized. Any discharge will occur at the current detention pond outlet point. <br /> (j) specify how you will comply with applicable Colorado water laws and regulations <br /> governing injury to existing water rights; <br /> Storage rights for the reservoir have already been adjudicated through the <br /> Colorado District Court, Water Division No. 1, Case No. 02 CW 391. <br /> (k) if refuse and acid or toxic producing materials are exposed during mining, describe <br /> how they shall be handled and disposed of in a manner that will control unsightliness <br /> and protect the drainage system from pollution; <br /> Because the material being removed consists entirely of soil, none are <br /> anticipated. However, if these types of materials are encountered, proper <br /> procedures and practices as defined by the State will be utilized. <br /> (1) describe what measures will be taken to minimize disturbance to the hydrologic <br /> balance, prevent off-site damage, and provide for a stable configuration of the <br /> reclaimed area consistent with the proposed future land use; <br /> The future land use is a reservoir which will be filled utilizing the Raindance <br /> Metropolitan District raw water system. All tributary stormwater is designed to <br /> be contained within the reservoir and discharged per the approved Final <br /> Drainage Report, Raindance Subdivision on file at the Town of Windsor. <br /> (m) specify whether the deposit will be processed on-site. If the deposit will be processed, <br /> then describe the nature of the process, facilities and chemicals utilized. The process <br /> area and any structures must be described on Exhibit E - Map; <br /> Nothing will be processed onsite. <br /> (n) identify the primary and secondary commodities to be mined/extracted and describe <br /> the intended use; and <br /> There are no commodities being extracted at the site. Soil is being removed for <br /> the purpose of creating a reservoir. Excavated soil is being used for the 1-25 <br /> expansion project by CDOT. <br /> (o) name and describe the intended use of all expected incidental products to be <br /> mined/extracted by the proposed operation <br /> None <br /> (p) Specify if explosives will be used in conjunction with the mining or reclamation <br /> TST, INC.CONSULTING ENGINEERS <br />