Laserfiche WebLink
5. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles,drill pads and collar areas of underground workings,ponds, etc. <br /> Dirt has been piled infront of main enternece portal. With the use of a mini excavator we <br /> we will clear the dirt from the main enterence. Once the dirt is clear we will inspect the <br /> h----IkhA-.;ad door, Of needed to gain access; tO Workings we will r move the door and Mak <br /> possible to gain access to workings. We will resecure bulkhead door to keep <br /> workings safe and secure. <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes,diameter,depth,location, etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Average Average <br /> Quantity Width (ft) Length (ft) <br /> B. Drill Holes: <br /> Diameter <br /> Quantity Depth (ft) (in) <br /> C. Mud Pits <br /> Average Average Average <br /> Quantity Width (ft) Length (ft) Depth (ft) <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance,describe type,quantity and general dimensions: <br /> Re opening, mapinq verification of exsisting workings. <br /> Form 2—Public File Page 6 of 14 <br />