My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-22_PERMIT FILE - M2021018
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021018
>
2021-03-22_PERMIT FILE - M2021018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2025 3:21:06 AM
Creation date
3/23/2021 6:34:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021018
IBM Index Class Name
PERMIT FILE
Doc Date
3/22/2021
Doc Name
Application
From
Ed Lyons
To
DRMS
Email Name
TC1
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase II-approximately 6 acres, reclamation as we go, and as we can will be done on previously <br /> disturbed, removal of vegetation and trees and processed, stormwater will be controlled with ditches <br /> and berms and all is subject to change. Best management practices will be applied to manage storm <br /> water.The stock piles will be changing as more material is removed from site and deposited to the stock <br /> pile, for this reason a perimeter ditch might be used instead of a silt fence, this perimeter ditch can <br /> easily be moved and maintained with equipment. <br /> 4a}F•;. <br /> AA Ab <br /> �a <br /> Good housekeeping should be followed though out the whole project. <br /> - Keep machinery in good operating condition to prevent leaks. <br /> - Monitor berms and roads and drainages <br /> - Spill Kits will be on site at all times- 5 gallon kits includes gloves, sorbent, dust pan and container to <br /> collect and store the clean- up material. 20 gallon kit PPE for 2 people sorbent and materials to absorb, <br /> shovel, plastic bags,ect. No hazardous materials just POLs. On site <br /> MSDS SHEETS ON SITE <br /> Daily Inspection Sheet Logbook will be kept onsite- Inspection dates and info <br /> NON Operational- Monitor and inspect once a week <br /> Road and Site Pad will be graveled so tracking in and out of site should not be a problem. <br />
The URL can be used to link to this page
Your browser does not support the video tag.