My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-18_PERMIT FILE - M2021014 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021014
>
2021-03-18_PERMIT FILE - M2021014 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2025 3:09:16 AM
Creation date
3/22/2021 6:47:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021014
IBM Index Class Name
Permit File
Doc Date
3/18/2021
Doc Name
Adequacy Review Response
From
Castle Rock Construction Company
To
DRMS
Email Name
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L/UUU01 it CI IVCIUPU ILI.L Z/I yUI r-DUVC- OeZ-OZOO-4U/1I VO I I Z14JIJ <br /> COLORADO <br /> Department of Transportation <br /> ` •• office of the chief Engineer <br /> PO#:461001608 <br /> Routing#:2 1-HA4-ZG-00096 <br /> Engineering Contracts NHPP R400-370 <br /> 2829 W.Howard Place,Suite 300 US 287/SH 40 Passing Lanes <br /> Denver,Colorado 80204 Project Code:22975 <br /> Telephone(303)757-9415 <br /> Notice of Award Date: 3/4/2021 <br /> CASTLE ROCK CONSTRUCTION COMPANY OF COLORADO,LLC <br /> 6374 S. RACINE CIRCLE <br /> CENTENNIAL,CO 80111 <br /> This is confirming notice,for record,that on the date identified above,you were awarded the contract for the <br /> construction of project NHPP R400-370(22975),on the basis of the bid as submitted. <br /> Per terms of the Notice of Award,your company has 15 days from the date of the notice to sign,date,and <br /> return the Contract along with the required bonds and insurance.Please do the following for <br /> completing and returning the enclosed contract award documents: <br /> 1.Have an authorized agent from your company complete the signature page of the Contract. <br /> 2. Complete both the Exhibit B Performance and Exhibit C Payment Bonds provided in the contract(please <br /> attach after Exhibit C any power of attorney documents using the Paper Clip function). <br /> 3.Provide a copy of your company's insurance certificates naming the State of Colorado,Department of <br /> Transportation as Additional Insured per the requirements identified in the Contract(please attach this after <br /> the last page of the contract using the Paper Clip function). Please see the insurance requirements on the <br /> next page of this Notice of Award. <br /> Once all the above contract documents have been returned to CDOT,they will be routed for internal <br /> signature approvals.As soon as the Contract is fully executed,a Notice to Proceed will be issued to your <br /> company. <br /> A pre-construction conference will be scheduled by the CDOT Resident Engineer identified in the Contract <br /> when the Notice to Proceed is issued. The work and the contract time will commence as authorized in the <br /> Notice to Proceed.No work shall begin until the Notice to Proceed is issued from CDOT. <br /> Respectfully, <br /> t�oc�%�Is�oon. <br /> Rocky Matson <br /> Contract Administrator III <br /> JSW/jw <br /> cc: RTD(Region 4) Region Traffic(Region 4) <br /> Maint. Super. (Region 4) Project and Grants <br /> Business Mgr.(Region 4) Region Planner(Region 4) <br /> Traffic Engr.(Region 4) <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.