My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-15_GENERAL DOCUMENTS - C1981044
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981044
>
2021-03-15_GENERAL DOCUMENTS - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2021 10:03:11 AM
Creation date
3/18/2021 10:00:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
General Documents
Doc Date
3/15/2021
Doc Name Note
For SL4
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Moffat County Mining, LLC
Permit Index Doc Type
Findings
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
diversity and woody plant density on lands designated as range sites A, and B for the Utah Tract and <br /> for the Strip Pit according to the appropriate reclamation plans in the permit. DRMS finds the <br /> applicable success standards have been met. <br /> V. PROPOSED DECISION <br /> Based on the above observations, the Division proposes to approve Moffat County Mining LLC's <br /> request for a partial Phase I, II and III bond release. This proposed decision will release the applicant <br /> from Phase I, II and III reclamation liability for those SL4 bond release parcels totaling 323.70 acres. <br /> The Division holds a performance bond of$4,691,000.00 for the Williams Fork Mine. The current required <br /> surety amount based on the approval of SL5 is$3,808,607.52. The total applicable bond for the 323.70 <br /> acres of Phase I,II and III reclamation is $2,657,357.03. However,based on DRMS' estimate it would <br /> cost the Division$1,708,602.00 to complete reclamation at the site in accordance with the reclamation plan. <br /> The Division cannot release the entire applicable bond associated with the SL4 acres because it would <br /> reduce the required surety amount below the amount the Division would need to complete reclamation. In <br /> order to hold adequate bond for the reclamation liability calculated for Mid Term Review 8,the Division <br /> proposes to release $2,100,005.52 with SL4 and retain the required$1,708,602.00 to complete reclamation. <br /> Reclamation work remaining to be done at the site includes pond reclamation around the remaining affected <br /> land;backfilling,grading,topsoiling,and seeding at the 5A portal and refuse pile, removing waste material, <br /> and sealing all required wells and boreholes. Also the reclamation completed at the No. 9 portal has not been <br /> released. Phase II and III liability remain for the SL5 area as well. <br /> Any person with a valid legal interest which might be adversely affected by this proposed decision may <br /> request a formal public hearing before the Mined Land Reclamation Board in accordance with Rule <br /> 3.03.2(6). Public notice of this proposed decision will be published twice in the Steamboat Pilot as <br /> soon as possible. Requests for public hearing must be submitted to the Division in writing within thirty <br /> days of the first publication in the Steamboat Pilot. If no hearing is requested within those thirty days, <br /> the Division's decision becomes final. <br /> Permit Number C1981044 Page 25 of 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.