My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-16_GENERAL DOCUMENTS - C1981022
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981022
>
2021-03-16_GENERAL DOCUMENTS - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2021 2:35:40 PM
Creation date
3/17/2021 2:34:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
General Documents
Doc Date
3/16/2021
Doc Name Note
Revised (SL4)
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Oxbow Mining, LLC
Permit Index Doc Type
Findings
Email Name
LDS
JDM
DC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The demolition of structures, and sealing and backfilling of the portals and vent shaft took place <br /> well before the submission of the SL-4 application,but was documented in the reports of <br /> inspections carried out at the time(see inspection reports dated August 12, September 10, <br /> October 16 and November 13, 2003) <br /> Summary and Conclusions <br /> Based upon a review of the mine permit,the applicant's bond release application, and site inspections, <br /> the Division finds that Oxbow Mining,LLC has completed backfilling, grading and drainage <br /> reestablishment at the Elk Creek Mine in accordance with the approved reclamation plan. <br /> PHASE II <br /> Group 1 (Bear Creek B-Seam Portal&Fansite(US Steel), Lower Hubbard Creek facilities area, <br /> Hubbard Creek Fan 91 Site) <br /> These sites were released from Phase H reclamation liability with SL-2. <br /> Group 2 (Sanborn Creek Mine Portals area, Sanbom Creek Mine Fan site) <br /> These sites have been approved for a post-mining land use of"Industrial/Commercial", and will <br /> be utilized by the North Fork Energy, LLC methane project. There is no revegetation standard. <br /> Erosion is minimized and controlled by in-place best management practices. During the SL-4 <br /> inspection it was noted that no erosional features or bare areas were observed. <br /> Summary and Conclusions <br /> Based upon a review of the mine permit,the applicant's bond release application, and site inspections, <br /> the Division finds that Oxbow Mining,LLC has replaced topsoil in accordance with the approved <br /> reclamation plan. Oxbow Mining,LLC has established vegetation which supports the approved post <br /> mine land use and meets the approved success standard for vegetative cover. The Division finds that the <br /> reclaimed area subject to this bond release is not contributing suspended solids to streamflow or runoff <br /> outside the permit area in excess of premising levels or in excess of adjacent nonmined areas. <br /> PHASE III <br /> Group I (Bear Creek B-Seam Portal&Fansite (US Steel),Lower Hubbard Creek facilities area, <br /> Hubbard Creek Fan 91 Site) <br /> During the SL-4 inspection the establishment of vegetation was inspected, and the land's <br /> capacity to support the post-mining land use was evaluated. Vegetative cover and species <br /> composition were visually evaluated to ensure that the reclaimed area would not excessively <br /> contribute suspended solids to streamflow outside of the permit area and that predominant <br /> species would support the post-mining land use. No noxious or invasive species were noted <br /> during the inspection. <br /> C-1981-022,SL-4 Page 7 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.