My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-16_GENERAL DOCUMENTS - C1981022
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981022
>
2021-03-16_GENERAL DOCUMENTS - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2021 2:35:40 PM
Creation date
3/17/2021 2:34:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
General Documents
Doc Date
3/16/2021
Doc Name Note
Revised (SL4)
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Oxbow Mining, LLC
Permit Index Doc Type
Findings
Email Name
LDS
JDM
DC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Division scheduled and conducted a bond release inspection on February 25,2021. The site <br /> inspection was conducted in accordance with Rule 3.03.2(2). The inspection was attended by <br /> Jason Musick(Division)and Doug Smith (Oxbow). No representatives of the Bureau of Land <br /> Management or the Office of Surface Mining, Reclamation and Enforcement were present. <br /> Table 1 <br /> Phase Site Details Landowner Post-mining Reclamation Previous Bond Acreage Acreage Source <br /> /manager Land Use Date Releases <br /> Phase Phase <br /> I II <br /> Bear Creek B-Seam Portal&Fansite(US SL-2 application, <br /> III Steel) BLM Undeveloped 1996 SL-2 SL-2 4.9 verified from <br /> aerial imagery <br /> SL-2 application, <br /> III Hubbard Creek Fan#1 Site,including DG1 Oxbow Undeveloped 2011 SL-2 SL-2 3.2 verified from <br /> aerial imagery <br /> SL-2 application, <br /> III Lower Hubbard Creek BLM Undeveloped 1996 SL-2 SL-2 2.6 verified from <br /> aerial imagery <br /> 10.7 <br /> I,II& Sanborn Creek Mine Portals Oxbow Industrial/ 2003 N/A N/A 4.1 Exhibit 2.05-E5, <br /> III Commercial Item 6 <br /> Sanborn Creek Mine Fan Oxbow Industrial/ 2003 N/A N/A 1.6 Exhibit 2.05-E5, <br /> III Commercial Item 6 <br /> 5.7 <br /> II. CRITERIA AND SCHEDULE FOR BOND RELEASE <br /> PHASE I <br /> Rule 3.03.1(2)(a) states, "Up to sixty percent of the applicable bond amount shall be released when the <br /> permittee successfully completes backfilling,regrading, and drainage control in accordance with the <br /> approved reclamation plan." With regard to Phase I bond release, structures were demolished, and mine <br /> openings were sealed and backflled at the Sanborn Creek Mine Portals area and the Sanborn Creek <br /> Mine Fan site in 2003. These areas have an Industrial/Commercial post-mining land use, as such,the <br /> backfill and grading and drainage re-establishment requirements are capable of supporting the post- <br /> mining land use. <br /> PHASE II <br /> Rule 3.03.1(2)(b) states, "Up to eighty-five percent of the applicable bond amount shall be released upon <br /> the establishment of vegetation which supports the approved postmining land use and which meets the <br /> approved success standard for cover...based on statistically valid data collected during a single year of <br /> the liability period". In regard to Phase II bond release,Rule 3.03.2(3)(b) also states, "No more than <br /> sixty(60)percent of the bond shall be released so long as the lands to which the release would be <br /> applicable are contributing suspended solids to streamflow or runoff outside the permit area in excess of <br /> premining levels as determined by baseline data or in excess of levels determined on adjacent nonmined <br /> C-1981-022,SL-4 Page 5 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.