My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-15_REVISION - C1981044 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2021-03-15_REVISION - C1981044 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2021 10:03:11 AM
Creation date
3/17/2021 2:01:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
3/15/2021
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Moffat County Mining, LLC
Type & Sequence
SL4
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical Revision(TR38),rectifying the situation through an update of the reclamation plan and to make a <br /> demonstration to the State Engineers Office for permanent designation as livestock water tanks for ponds 9A- <br /> P2, 9A-P3,and 9A-P4. Exhibit 18B,Permanent Pond Approvals,was submitted through the TR adequacy <br /> process. TR38 was initiated on 21 September 2020,adequacy responses were received from MCM on14 <br /> December 2020 and the permitting action became final on 5 January 2021. The Colorado Division of Water <br /> Resources granted permanent status on 4 December 2020 for ponds 9A-P3 and 9A-P4. Permanent <br /> designation was not granted for pond 9A-P2, due to the height of its dam. Because permanent designation <br /> was not granted for pond 9A-P2,this feature must be reclaimed. DRMS communicated with the operator <br /> offering suggestions on how best to move forward. MCM withdrew the affected land associated with Pond <br /> 9A-P2 from consideration for bond release. Access to the pond and associated topsoil pile is illustrated <br /> below on Map II_ DRMS received the USDA concurrence letter as per Exhibit 24 of the permit Document <br /> on 10 February 2021 and the updates to the Williams Fork Sediment Demonstration from MCM on 3 Feb <br /> 2021. <br /> Map II,illustrates the access <br /> road to be utilized for pond <br /> reclamation. The expected 0.2 <br /> acres of disturbance would <br /> TaP!�OIL occur around the perimeter of <br /> the pond and as a result of <br /> /f hauling from the topsoil pile to <br /> EROSION NTROL pond 9A-P2. <br /> FURROWS <br /> �• � Access Road <br /> Map IT Shows the access road to topsoil pile and Pond 9AP2. <br /> The USDA concurrence letter received from the NRCS concluded that based on their review of the Testing <br /> for Revegetation Success for Bond Release section of the bond release submittal that MCM has"fully <br /> established perennial herbaceous vegetation" supporting the intended post mining land use. NRCS cautioned <br /> that the permitted use of introduced species"will limit future establishment of native species". <br /> Permit Number C1981044 Page 7 of 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.