Laserfiche WebLink
Crm�� CRMCA Concrete Quality Pre-Construction Checklist <br /> Contractor's Responsibilities in accordance with ACI 301-10 Section 1.6.2 <br /> • Allow access to the project site or to the source of materials and assist Owner's testing agency in obtaining and <br /> handling samples at the project site or at the source of materials. <br /> • Advise Owner's testing agency at least 24 hours in advance of operations to allow for scheduling of quality <br /> assurance tests, review of project requirements, and for the assignment of personnel. <br /> • Provide space and source of electrical power on the project site for facilities to be used for initial curing of concrete test <br /> specimens as required by ASTM C31 for the sole use of Owner's quality assurance testing agency. <br /> Concrete Sampling and Testing Requirements <br /> Sampling Frequency: <br /> Sampling Location: (Circle Yes or No) <br /> Pt. of truck discharge (in accordance with ASTM C94) yes no <br /> Pt. of placement (must be specified and comply with OSHA regulations) yes no <br /> Note 2: The concrete supplier will be responsible for compliance when samples are obtained at truck discharge after <br /> 10% or before 90%of the batch has been discharged and tests are conducted in accordance with applicable <br /> ASTM standards. <br /> Tests to be performed on each sample: (Circle Yes or No) <br /> Slump: yes no Compressive Strength: yes no <br /> Air Content: yes no #cylinders per test <br /> Density (unit wt.): yes no Flexural Strength: yes no <br /> Temperature: yes no Other: yes no <br /> Note 3:ASTM C172, section 4.1.1 states. "Transport the individual samples to the place where fresh concrete tests <br /> are to be performed or where test specimens are to be molded."Section 4.1.2 states, "Start tests for slump, <br /> temperature and air content within 5 min. after obtaining the final portion of the composite sample." <br /> Acceptance/Rejection of Fresh Concrete: <br /> Who has the authority to accept or reject a concrete delivery? <br /> What criteria will be used to accept or reject a concrete delivery? (Circle Yes or No) <br /> Slump: yes no Temperature: yes no <br /> Air Content: yes no Density(unit wt.) yes no <br /> W/CM Ratio: yes no Time Limit: yes no <br /> Note 4:ASTM C94, section 7.2 states, "the producer shall not be responsible for the limitation of minimum slump or <br /> slump flow after 30 min. have elapsed starting either on arrival of the vehicle at the prescribed destination or at the <br /> requested delivery time,whichever is later." <br /> Who's responsible for adding water and/or air entrainment at the project site? <br /> Note 5: ASTM C94 section 12.7, allows a'one-time'water addition as long as the maximum water content for the batch as <br /> established by the mixture design proportions has not been exceeded. A'one-time'water addition may be several distinct <br /> additions provided no concrete has been discharged except for slump or slump flow testing. When air content is below the <br /> specified level, Section 8.3 allows the concrete supplier to adjust the level with additional air-entraining admixture. <br /> CRMCA Document#TC-01 Page 2 Revised 7.23.15 <br />