Laserfiche WebLink
Section 2.03 LEGAL, FINANCIAL, COMPLIANCE AND <br /> RELATED INFORMATION <br /> 2.03.1 <br /> The purpose of this section is to ensure that the CDMG receives all relevant information <br /> required on surface ownership, coal ownership and the complete history and status of <br /> New Elk Coal Company LLC (NECC ) for continued coal mining operations at the <br /> Lorencito Canyon Mine. This information is provided in the following sections to <br /> answer each specific question with regards to operation. <br /> 2.03.2 RESPOSIBILITIES <br /> A written description is included in this permit application under which NECC will <br /> continue mining operations at the Lorencito Canyon Mine. The following sections <br /> provide the required information for conducting coal mining in Colorado. <br /> 2.03.3 FORMAT AND SUPPLEMENTAL INFORMATION <br /> Information which has been utilized by prior permittees to support the baseline data and <br /> other operating data is included in the text and presented in the Exhibits portion of this <br /> application. Data which has been taken from various reports, analysis, and other <br /> reference material is shown on the Maps and within the application for which this <br /> information was developed. <br /> Numerous analyses of the land uses, cultural resources, soils, overburden, coal, under <br /> burden, surface and ground water, air quality,vegetation, and wildlife have been <br /> completed by Lorencito Coal Company, LLC (LCC) from January 1996 to present. All <br /> field and laboratory analyses were conducted in accordance with 40 CFR 136. All tests, <br /> analyses, and surveys carried out pursuant to the Rules and Regulations have been <br /> performed or certified by a qualified person. Time periods for all analyses are described <br /> in the text of exhibits of this application. Organizations responsible for collection and <br /> analysis of this information includes the following: <br /> Mr. Jim Cooper Project Manager <br /> Mr. J. William Huber, P.E. Project Engineer <br /> Mr. Robert Bassett, Dorsey&Whitney Legal Advisory, Mine Planning <br /> Facilities Engineering <br /> MR-15 2.03-1 (Revised 02/13/2017) <br />