Laserfiche WebLink
Topsoil will be salvaged from the drill sites prior to their construction. Salvaging will include <br /> removing the top 12 inches of soil or the amount available and stockpiling this material in the <br /> general vicinity of its removal in an area where it will not be removed from the drill site area. <br /> Stockpiles of topsoil will be compacted to prevent erosion by wind and other elements until used <br /> for reclamation. Topsoil at each drill pad if the area has not been previously disturbed will be <br /> stored on the upslope side of the drill pad when safe and practicable to do so to minimize risk of <br /> erosion. <br /> The premine land use is shown on Map 4 covering the entire Permit Area. The soil for the <br /> Permit Area is shown on Map 9. The vegetation survey for the Permit Area is shown on Map <br /> 10. Revegetation for the drill sites will be consistent with practices at the New Elk mine site <br /> described in Section 2.05.4 (f) in this Permit Application Package. <br /> No holes will be developed as monitoring wells. <br /> 2.02-3 <br /> M R-126 Revised: 1/21/2021 <br />