My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-04_GENERAL DOCUMENTS - C1981022
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981022
>
2021-03-04_GENERAL DOCUMENTS - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 7:29:18 AM
Creation date
3/10/2021 7:25:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
General Documents
Doc Date
3/4/2021
Doc Name Note
For SL2
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Oxbow Mining, LLC
Type & Sequence
SL2
Permit Index Doc Type
Findings
Email Name
JDM
LDS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sec. 17: NE'/4NW'/4, and NW'/4NE'/4, North of the Centerline of the River and <br />Town of Somerset <br />Township 13 South, Range 91 West, 6th PM — <br />Sec. 1: All <br />Sec. 2: Lots 1, 2, 3, 4, S'/2NW'/4, S'/2NE'/4, SE'/4, N'/2SW'/4 <br />Sec. 3: Lots 1, 2, 3, S'/2NE'/4, N'/2SE'/4 <br />Sec. 11: E'/2NE'/4 <br />Sec. 12: All <br />Sec. 13: Lot 1, N'/2NE'/4 <br />Summary of Previous Bond Releases <br />Partial Phase I Bond Release SL-1, was received on February 27, 2019 and requested a release of <br />19.4 acres located on the Lower and Middle Pads of the Elk Creek Mine facilities area and a <br />portion of the East Yard area. The Division approved the Partial Phase I Bond Release SL-1 on <br />October 18, 2019 and released $210,404.76 <br />An application for Partial Phase I, II and III bond release was received by the Division on <br />September 16, 2019. The application was deemed complete on December 4, 2019, after the <br />Division received proof of publication of the applicant's public notice. Oxbow published notice <br />of the bond release application in the Delta County Independent once weekly for four <br />consecutive weeks, beginning October 2, 2019. Oxbow also notified land owners within and <br />adjacent to the mine permit area, and other interested parties of the application for bond release, <br />as required by Rule 3.03.2(1). <br />No comments, written objections, or requests for an informal conference regarding the bond <br />release application were received by the Division. <br />The Division scheduled and conducted a bond release inspection beginning on July 7, 2020, <br />which allowed time for snow to melt and roads to dry out. The site inspection was conducted in <br />accordance with Rule 3.03.2(2). The inspection was attended by Leigh Simmons and Jason <br />Musick (Division), Christine Belka (OSMRE), Doug Smith and Mike Ludlow (Oxbow), Dan <br />Gray (USFS), and Desty Dyer (BLM). No representatives of Hotchkiss Ranches were present, <br />although they had been notified of the inspection by certified mail. A follow up inspection was <br />made on August 13, 2020, attended by Leigh Simmons and Doug Smith. <br />At a meeting before the July 7 inspection, the list of sites included in the SL-2 application (pages <br />4-8 of the application packet) was reviewed by all parties. It was agreed that several of the sites <br />would be withdrawn from the application and excluded from the inspection since their post - <br />mining land use was subject to revision with TR-78, which was in progress at the time (and still <br />is, as of the date of these findings), or because the site in question had not been reclaimed in <br />accordance with the currently approved reclamation plan. A number of the rows in the <br />application tables were determined to be duplicative. The final list of sites to be released with <br />SL-2 is given in Table 1, below. <br />C-1981-022, SL-2 Page 4 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.