Laserfiche WebLink
OF co <br /> *� C M2001-106 TR01 <br /> *� <br /> 0 Violations [ON, MINING AND SAFETY <br /> Complied! <br /> "�s�e� JPL_/le/awa )203 ph(303)866-3567 <br /> 1 Minor Infraction <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET MAR 09 2021 <br /> File No.: M- 2001 -106 site Name: Orlando Pit DIWGIGN <br /> S E�T1TflON <br /> MINING AND <br /> county H u e r a n o TR# ORMS Use only <br /> Permittee: Huerfano County Government <br /> Operator(If Other than Permittee): <br /> Peittee Representative: Melanie Bounds <br /> rm (�— <br /> Please provide a brief description of the proposed revisi <br /> Revision is to update legal description (exhibit A), exhibit index map, reclamation plan map, <br /> pre-mining plan map, and mining plan map to reflect current conditions <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tyne Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> 110d, 112d(1, 2 or 3) $1006 <br />