My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-09_REVISION - M2001046 (17)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001046
>
2021-03-09_REVISION - M2001046 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2025 2:27:14 AM
Creation date
3/10/2021 6:31:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001046
IBM Index Class Name
REVISION
Doc Date
3/9/2021
Doc Name
Request For Amendment To Permit
From
Ready Mixed Concrete Company, LLC
To
DRMS
Type & Sequence
AM1
Email Name
ECS
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii. Outlining the sequence in which each stage or phase of reclamation will be carried <br /> out. <br /> Please refer to the Timetable for Mining and Reclamation in Section (e) of Exhibit D. <br /> (fJ A description of: <br /> i. Final grading—maximum anticipated slope gradient or expected ranges thereof; <br /> The finished slopes of the reservoir will be no steeper than 3 horizontal to 1 vertical. <br /> ii. Seeding—types, mixtures, quantities and time of application; <br /> Please refer to the Reclamation Plan Map for the list of plant materials and seeds to be <br /> utilized. The operator will seed during the appropriate season to ensure adequate <br /> moisture for germination and implement weed controls to allow the grasses to successfully <br /> establish. Additional plantings may be installed once the reservoirs are full of water and <br /> the grasses are established. <br /> iii. Fertilization—types, mixtures, quantities, and time of application; <br /> The type and application rate of fertilizer shall be determined based on a soil test at the <br /> time of final reclamation. <br /> iv. Revegetation—types of trees, shrubs, etc.; <br /> Please refer to the Reclamation Plan Maps for the types, quantities and location of <br /> plantings. Trees and shrubs are generally avoided in the design of reservoir facilities to <br /> avoid root system breach of slurry walls. Woody plantings during the life of mine will be <br /> determined in review of the local zoning permit. <br /> v. Topsoiling—specify anticipated minimum depth or range of depths for those areas <br /> where topsoil will be replaced. <br /> Topsoil will be uniformly placed and spread on all areas disturbed by the mining above the <br /> anticipated high water line. The minimum thickness shall be 6 inches above the <br /> surrounding finished grade. <br /> WEED MANAGEMENT PLAN <br /> The Operator will monitor and control noxious weeds as they appear. The Operator typically <br /> prefers to control weeds mechanically, by mowing and/or discing. If necessary, weeds will be killed <br /> with a contact herbicide. <br /> Nix—Gravel Mine—MLRB 112 Permit Application <br /> Exhibit E-5 <br /> Page 19 of 126 <br />
The URL can be used to link to this page
Your browser does not support the video tag.