Laserfiche WebLink
Creek Mine, with the acres that have achieved each phase of bond release. Table 3 shows the maximum <br />amount of bond eligible for release based on the acreages in Table 2. <br />Table 2 <br />Elk Creek Mine C-1981-022 Bond Release History <br />Bond Release Acreage <br />Total <br />Disturbed <br />Phase I <br />Released <br />Phase I <br />Remaining <br />Phase II <br />Released <br />Phase II <br />Remaining <br />Phase III <br />Released <br />Phase III <br />Remaining <br />SL-1 <br />239.2 <br />19.4 <br />219.8 <br />0 <br />239.2 <br />0 <br />239.2 <br />SL-2 <br />239.2 <br />138.74 <br />81.06 <br />72.69 <br />166.51 <br />2.33 <br />236.87 <br />Table 3 <br />Maximum Bond Eligible For Release per Rule 3.03.1(2) <br />SL-2 Acres <br />SL-2 <br />Total (239.2 acres) <br />Phase I - 60% <br />138.74 <br />$1,504,787.66 <br />$2,594,386.68 <br />Phase II - 25 % <br />72.69 <br />$328,501.20 <br />$1,080,994.45 <br />Phase III - 15% <br />2.33 <br />$6,317.85 <br />$648,596.67 <br />Total <br />$1,839,606.71 <br />$4,323,977.80 <br />The reclamation liability prior to SL-2 was $4,113,573.04. Based on the maximum bond eligible for <br />release amount from Table 3, the minimum new reclamation liability is $2,273,966.33 (that is, <br />$4,113,573.04 - $1,839,606.71). <br />The Division estimates the cost to complete the reclamation tasks remaining at the Elk Creek Mine to be <br />$2,100,881, based on subtracting the cost of the tasks associated with SL-2 from the most recent site -wide <br />Reclamation Cost Estimate (SL-1/RN-7). <br />Since the minimum new reclamation liability ($2,273,966.33) exceeds the estimated cost of remaining <br />reclamation ($2,100,881), the maximum eligible amount ($1,839,606.71) will be released with SL-2. The <br />amount of bond to be released is summarized in Table 4. <br />Following the issuance of SL-2 the new reclamation liability for the Elk Creek Mine will be <br />$2,273,966.33. <br />C-1981-022, SL-2 Page 22 of 23 <br />