My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-08_INSPECTION - C1981019
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2021-03-08_INSPECTION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 2:56:20 PM
Creation date
3/8/2021 2:31:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
3/8/2021
Doc Name
Inspection Report
From
DRMS
To
Colowyo Coal Company LP
Inspection Date
3/3/2021
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection Y -Roads <br /> N -Availability of Records Y -Reclamation Success <br /> R -Backfill&Grading N -Revegetation <br /> R -Excess Spoil and Dev. Waste N - Subsidence <br /> N -Explosives N - Slides and Other Damage <br /> N -Fish&Wildlife N - Support Facilities On-site <br /> R -Hydrologic Balance N - Signs and Markers <br /> R -Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N -Other N - Special Categories Of Mining <br /> N -Processing Waste Y -Topsoil <br /> CONVOENTS <br /> This was a aerial inspection of the Colowyo Mine flown by Brock Bowles and reported by Zach Trujillo,both of <br /> the Colorado Division of Reclamation,Mining and Safety(DRMS)on March 3,2021.No mine representative was <br /> present during the inspection. Weather conditions were clear with a high temperature around fifteen degrees <br /> fahrenheit. Ground conditions were partially snow covered. <br /> BACKFILL and GRADING—Rule 4.14 <br /> Contemporaneous Reclamation 4.14.1;Approximate Original Contour 4.14.2;Highwall Elimination 4.14.1(2)(f); <br /> Steep Slopes 4.14.2,4.27;Handling of Acid and Toxic Materials 4.14.3; Stabilization of Rills and Gullies 4.14.6: <br /> Contemporaneous backfilling and reclamation continues in the South Taylor Pit. Dragline operations moves <br /> overburden along the active mining section in the western end of the pit and backfills the eastern section of the pit <br /> that has previously been mined. <br /> 41 <br /> .. <br /> C; <br /> South Taylor Pit <br /> EXCESS SPOIL and DEVELOPMENT WASTE—Rule 4.09 <br /> Placement;Drainage Control; Surface Stabilization: <br /> The West Taylor Fill was inspected. The surface of the fill was snow covered but no signs of issues were <br /> observed. <br /> The Collom Temporary Spoil Pile continues to be constructed. Spoil from the Collom Pit is being moved by truck <br />
The URL can be used to link to this page
Your browser does not support the video tag.