Laserfiche WebLink
E. Other Disturbances (please describe) <br /> The 3"core hole will be used for long-term vibrating wire piezometer monitoring of water pressure in the groundwater zones <br /> encountered while drilling. This activity is expected to last 4 years. The 3"core location will be terminated with a 3"PVC pipe <br /> 24"-36"above grade. This will be surrounded by a metal pipe guard rail approximately 48"x 48"square and 60"tall. All <br /> exposed items will be painted juniper green to match the landscape. The remainder of the area will be reclaimed as detailed <br /> below,at the conclusion of the drilling. The 3"piezometer will be plugged and abandoned at the end of the monitoring period <br /> and then that portion will be reclaimed to complete the NOI. <br /> F. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to <br /> store. <br /> Drilling will use air and/or water. Generators and equipment will use diesel fuel and <br /> grease. Diesel fuel will be stored in a fuel truck on the drilling pad. Greases and oils will <br /> be stored in or on the fuel truck. Self contained toilet facilities will be used on site for <br /> human waste. These will be cleaned periodically by a service company. <br /> G. New Roads: <br /> Length (ft): 600 Width (ft): 12 <br /> Significantly <br /> Upgraded Roads Length (ft): Width (ft): <br /> Are culverts or other crossings proposed? If so, please describe: <br /> NONE. <br /> H. Total project area to be disturbed (acres) 0.5 <br /> I. Describe the equipment to be used for the prospecting operations: <br /> Core drilling rig. Diesel powered generator. Diesel powered air compressor. Fuel truck. <br /> 500 barrel water storage tank. Pipe storage truck. Control building. Personal <br /> transportation trucks (up to 6). <br /> Form 2—Public File Page 7 of 14 <br />