Laserfiche WebLink
Exhibit L- Reclamation Costs <br /> Lyons Quarry Area I Reclamation Cost Estimate <br /> Description Estimated Quantity <br /> 1.0 Mobilization/Demobilization Job 1 N/A $225,000.00 <br /> 2.0 Project Safety Plan Job 1 N/A $55,000.00 <br /> 3.0 Erosion Control Job 1 N/A $125,000.00 <br /> 4.0 Survey Job 1 N/A $65,000.00 <br /> 5.0 Debris Removal(10 ton/load) Load 5 $1,600.00 $8,000.00 <br /> 6.0 Earthwork <br /> 6.1 Excavation & Blasting CY 245,080 $5.35 $1,311,178.00 <br /> 6.2 Fill and Compaction CY 155,300 $2.00 $311,600.00 <br /> 6.3 Scour Berm/Drainage Riprap CY 20,000 $28.00 $560,000.00 <br /> 6.4 Final Grading Acre 37.2 $1,000.00 $37,200.00 <br /> 7.0 Ground Control <br /> 7.1 Rock Scaling Hour 144 $500.00 $72,000.00 <br /> 7.2 Rock Reinforcement Each 20 $7,000.00 $140,000.00 <br /> 8.0 Stormwater Management <br /> 8.1 Install Runoff Channels LF 3,820 $33.00 $126,060.00 <br /> 8.2 24"Class V RCP LF 165 $550.00 $90,750.00 <br /> 9.0 Restoration <br /> 9.1 Soil Test Plots Each 4 $14,901.00 $59,604.00 <br /> 9.2 Soil Conditioning Acre 37.2 $11,00&00 $409,200.00 <br /> 9.3 Re-vegetation Acre 37.2 $4,400.00 $163,680.00 <br /> Seeding #PLS 615.7 $120.00 $73,879.20 <br /> Fertilizing Lbs. 13,020 $3.00 $39,060.00 <br /> Scarifying Acre 37.2 $864.00 $32,141.80 <br /> Mulching 40 lb. Bale 3,720 $5.00 $18,600.00 <br /> 10.0 Chain Link Fencing LF 3,366 $20.00 $67,320 <br /> Total of Items 1.0-10.0 $3,826,592.00 <br /> March 2021 D-3 <br />