Laserfiche WebLink
Lyons Quarry �`` <br /> 112d Reclamation Permit Operations ,l/Z <br /> Technical Revision <br /> Item 6.0— Earthwork <br /> Item 6.1 —Excavation and Blasting <br /> Once the site controls are installed, the grading plan will be implemented. All areas will be <br /> appropriately marked to protect vegetation and structures. The work areas will then be cleared and <br /> grubbed prior to excavation and backfilling. Topsoil sources will be stripped and appropriately <br /> stockpiled. <br /> As described in the Geotechnical Stability Exhibit, Attachment E, cut slopes in the overburden <br /> sedimentary rock will be excavated using heavy equipment or drill and blast methods to achieve <br /> overall 2H:1V slopes. Excavated material from the Fountain Formation sandstone will be segregated <br /> into riprap or fill material onsite with the fill material either being sent to Quarry 2 for backfill or <br /> transported down to the swale at the entrance to Quarry 1. The CAT 349 excavator and CAT D9 <br /> dozer will perform the majority of excavation with the excavator and wheel loader loading the CAT <br /> 740 haul trucks. <br /> The riprap rock material will be screened and sized with the largest gradation used for the scour <br /> berm at the base of the quarry. Smaller riprap (Type M)will be used for lining the drainage channels. <br /> As shown in Table 3 the estimated aggregate excavation volume to establish the final grading for <br /> the Quarry 1 area is approximately 245,080 CY. Excavation and fill requirements for the floodplain <br /> (Area 2), which are covered in Technical Revision #4, are included for reference. Technical <br /> Specifications, including blasting requirements, for Excavation are included in Section 31 23 16 of <br /> Attachment G. <br /> Table 3 — Estimated Excavate-Fill Quantities ■I'� <br /> p <br /> I <br /> Area 1 —Quarry Slope Grading 245,080 125,300 <br /> Catchment Berms 8,250 <br /> Sedimentation Pond Fill 2,250 <br /> Scour Berm and Drainage Channel Riprap 20,000 <br /> Area 2— Floodplain Soil Removal 23,300 13,685 <br /> Total Project 268,380 169,485 <br /> Excavate-Fill Balance 98,895 <br /> Item 6.2— Fill <br /> Fill slopes in the Quarry 2 highwall area will be placed and compacted to achieve 50-foot-high <br /> benches, sloped 2H:1 V, with 15-foot wide benches. Compaction will be performed with tracked <br /> equipment(D9 dozer) a minimum number of passes to achieve specified densities. Including Quarry <br /> 2 and catchment and scour berms, the estimated aggregate fill volume to establish the final grading <br /> for Area 1 is approximately 155,800 CY. Fill materials will consist of overburden materials that are <br /> uniformly graded continuously from boulder size to silt size, with a maximum particle size equal to <br /> two-thirds of the lift thickness and maximum 45 percent fines in the minus 3-inch fraction. <br /> March 2021 1 16 <br />