Lyons Quarry ��� <br /> 112d Reclamation Permit Operations <br /> Technical Revision <br /> elevations from 5,500 to 7,000 feet above mean sea level. If irrigation is required, an estimated <br /> maximum 1.0 total acre feet is projected to establish vegetation with the goal of no watering once <br /> plants are established. The water would be pumped from an existing sedimentation pond at a rate of <br /> 40 to 80 gallons per minute, depending upon the irrigation system setup, season, and weather <br /> conditions. Areas of revegetation will be maintained for up to one growing season to control weed <br /> infestation. <br /> The sedimentation pond would be utilized during construction for dust control, fill moisture <br /> conditioning and watering vegetation as needed. Mining Permit M-1977-141, Technical Revision#2 <br /> calls for the 0.3-acre sedimentation pond at the eastern end of the site to be backfilled following all <br /> reclamation operations. Grading will blend with surrounding topography and be sloped towards <br /> South St. Vrain Creek(Attachment B). BCPOS has expressed interest in leaving the pond in place <br /> due to its importance to wildlife including Northern Leopard Frogs and Little Brown Bats, both of <br /> which are species of concern for this area. Aggregate Industries will have biologists available to <br /> monitor for these species of concern during reclamation activities. Recent correspondence with <br /> BCPOS indicates that they do not have augmentation water rights available and to proceed with <br /> filling the pond as part of the reclamation. <br /> 4 Exhibit F — Reclamation Plan Map <br /> The Reclamation Plan Map is provided as Attachment C. <br /> 5 Exhibit L — Reclamation Costs <br /> Estimated reclamation costs for each of the major work items described below are summarized and <br /> presented in Exhibit L— Reclamation Costs, Attachment D. <br /> 5. 1 Planned Reclamation Scope of Work <br /> The following tasks are specific to the reclamation work to be performed in the Lyons Quarry Area 1 <br /> (LQRA1) location and do not include tasks to be performed within the reclamation of the floodplain <br /> areas (LQRA2-LQRA5)which are covered in Technical Revision #4. <br /> Item 1.0— Mobilization/Demobilization <br /> This item includes all costs necessary and incidental to move equipment and supplies onto the <br /> project area, perform minimal road improvements, if required, move equipment within the project <br /> area during the course of the project, and any other requirements necessary for the successful <br /> completion of this project. The operator will maintain such temporary works and equipment <br /> throughout the period of construction. This item also includes all labor, equipment, and costs <br /> associated with demobilization and clean-up of the project site following the completion of the <br /> project. For the scope of work proposed, Aggregate assumes that the following equipment will be <br /> mobilized to the site.- <br /> 0 (1) Front-end wheel loader with 4.5 CY bucket(Caterpillar 950 or equivalent) <br /> • (1) Track-mounted excavator(Caterpillar 349 or equivalent) <br /> March 2021 114 <br />