My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-02_REVISION - M1990057
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990057
>
2021-03-02_REVISION - M1990057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2025 4:08:21 AM
Creation date
3/5/2021 9:28:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
REVISION
Doc Date
3/2/2021
Doc Name Note
Part 3 of 3
Doc Name
Request For Amendment To Permit
From
CJK Milling Company, LLC
To
DRMS
Type & Sequence
AM2
Email Name
DMC
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
491
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> F _ <br /> The leadville Mill M 1990-057 <br /> EXHIBIT U —DMO-EPP <br /> Page 14-11 <br /> PF+er to pFeeessiRg, the ReM eFe all be alyi� d s s to , Y,deFs+and hew best t-9 <br /> eeReeRtFate will be shipped ef site te a smelter, <br /> sTorTp or, site I.. a Qoag�e �IPed TSF as described ie Seetie � .1 Ha 4--rSeet+e144r <br /> Processed ore will be disposed in the TSF as described in Section 4. <br /> (iv) Off-Site Impact Prevention <br /> The following measures will be taken to prevent off-site impacts: <br /> • Prior to processing, stockpiled ore will be placed in an impermeable concrete <br /> pad steFage bunk.,rS, lecated- E)R Iew peFmeability eeneFete sterage ad <br /> • St Fag bun The pad will be covered and protected on three sides, <br /> • QR'y small Limited quantities of designated chemicals will be used in the mill at <br /> any given time, <br /> • The mill building is designed to contain spills. Spill prevention measures include <br /> concrete floors and over-liners for liquid chemical storage within the storage <br /> and processing areas, <br /> • The FAill building is designed te centain spoils withiR the buildiRg in the sump. <br /> Thp TUw*11 provide seeendaFy GOIAtaiRment, if a spill breaches the moll h- <br /> eeRtainment system, <br /> • Liquid chemical will be stored in designated areas in 55-gallon over-packs <br /> barrels, <br /> +h •II + + •+ c IIs�r•l�� <br /> crre�vv repvrc cv either the baild+r+���-TSB. S��s� <br /> PhIp to Wave the site given the physical dirt Rce to epeR teF r depth to <br /> ff6undwateF (SeetieR -14.4-�s i i i ilag-expesur S1, +hr„,,gh ff site <br /> m_igFatieR to these Feeept„rs; a-RdA mill sump will contain mill spills. If a spill <br /> breaches the mill building the TSF will provide containment, and <br /> • <br /> ;n6tiat+eR of the millingphase. Environmental water, air and mine waste <br /> monitoring and maintenance programs will be active during and following mill <br /> closure. (See Section 14.7). <br /> Version 3.0 January 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.