My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-02_REVISION - M1990057
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1990057
>
2021-03-02_REVISION - M1990057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2025 4:08:21 AM
Creation date
3/5/2021 9:28:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990057
IBM Index Class Name
REVISION
Doc Date
3/2/2021
Doc Name Note
Part 3 of 3
Doc Name
Request For Amendment To Permit
From
CJK Milling Company, LLC
To
DRMS
Type & Sequence
AM2
Email Name
DMC
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
491
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21 If-IT <br /> The Leadville Mill M1990-057 <br /> EXHIBIT U—DMO-EPP <br /> Page 14-1 <br /> 14 . 0 EXHIBIT U — DESIGNATED MINING <br /> OPERATION ENVIRONMENTAL <br /> PROTECTION PLAN ( SEC 6 . 4 . 21 ) <br /> 14. 1 DESCRIPTION OF COMPLIANCE (SEc 6.4.21 (1 )) <br /> This section describes the procedures and containment strategies implement by which <br /> Leadville Mill,will protect human health and the environment. On November 23, 2011 <br /> CDRMS listed the Leadville Mill as "Designated Mining Operation" (DMO). The DMO <br /> regulations requires the preparation of an Emergency Response and Management <br /> Plan54 and an Environmental Protection Plan (EPP)55. The purpose of the plans to <br /> establish emergency response plans and to set guidelines to manage designated <br /> chemicals <br /> The DMO designation requires an operator (see Section 6 Exhibit C Figure 6-2) using <br /> chemicals such as xanthates, to prepare a safety, chemical and containment <br /> management plans outlining the use, storage, handling, and disposal of chemicals. <br /> Leadville Mill has designed the milling process and the TSF to minimize the amount of <br /> water and chemicals used in the process as well as minimizing the amount of water <br /> required to dispose tailings disposal. <br /> The EPP includes: <br /> • Managing designated and minimizing chemical uses <br /> • Implementing "best management" water recycling technologies, <br /> • Managing and maintaining the TSF56 containment, <br /> • Constructing and maintaining chemical secondary containment barriers, <br /> • Adopting good housekeeping practices, and <br /> sa Sec. 16, Exhibit-Rule 8 <br /> ss Sections 34-32-103(4.9)and 34-32-116.5,C.R.S. 1984, as amended <br /> se The TSF is designed with a leak detection system,drainage net,a geosynthetic clay liner,a 45 mil polypropylene <br /> geomembrane and a sump. <br /> Version 3.0 January 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.